Electrical Coordination
Obtain the following information from the project electrical engineer...
- Determine voltages and phasing available.
- Location of electrical rooms.
- Availability of emergency power.
- Requirement for generator diesel fuel supply or natural gas service.
- Separation requirements between transformers and plumbing specified equipment.
Communicate with the persons designing the electrical systems of your projects. This should begin
during the early stages and continue as design develops. The forms below help organize the information
that needs to be conveyed. There are two separate forms available. The first allows you to identify
proposed Plumbing equipment and systems at the conceptual or schematic phase. The second accomodates
detailed input such as horsepowers, voltages, locations, etc...
Preview the Form
Download the Form
Forms are rich text files saved as
pepcoord.zip (9kb)